BARBADOES
This 3 story - 4 unit build was an insurance knock down rebuild.
The method for the foundations required screw piling and ground sheer keys. This medium spec project was delivered on time and budget.
1/3
This 3 story - 4 unit build was an insurance knock down rebuild.
The method for the foundations required screw piling and ground sheer keys. This medium spec project was delivered on time and budget.